Skip to content
Triangle Local

Raleigh, Wake County

Raleigh: City breaks ground on convention center expansion

The City of Raleigh says Wednesday's ceremony started the Atlantic Union Bank Convention Center expansion, adding 298,100 square feet. WRAL schedules a 2030 grand opening. CBS 17's earlier story says 2029.

ConfirmedThe main facts are confirmed by official or first-hand sources.

By Alexandru Stanciu · Published

Downtown Raleigh buildings under a blue sky

File photo: James Willamor (CC BY-SA 3.0), via Wikimedia Commons.

What we know

Confirmed

  • The City of Raleigh posted a release headlined Raleigh Celebrates Groundbreaking for Atlantic Union Bank Convention Center Expansion. A print line on that page reads 11/18/2026 5:03 pm and does not name a time zone. This file reads that stamp as Eastern. The post says the city has officially broken ground and refers to today's groundbreaking. It does not print a start time for the ceremony.Confirmed by City of Raleigh news post, print stamp 5:03 p.m. Nov. 18, 2026
  • The city post says Mayor Janet Cowell, City Manager Marchell Adams-David, Wake County Commission Chair Don Mial, Atlantic Union Bank Chief Marketing Officer Christine Landi, and Baker Glasgow, president of Clancy & Theys, joined community partners. It says Glasgow was there on behalf of the Construction Management Joint Venture.Confirmed by City of Raleigh news post, Nov. 18, 2026
  • The city post says the expansion adds 298,100 square feet of event space, including a 50,000-square-foot flex hall, an 18,000-square-foot ballroom, and 13 additional meeting rooms. It says that since opening in 2008 the center has welcomed more than 6 million visitors and generated more than $1 billion in economic impact. It says construction is expected to continue over the coming years. It does not name a finish year, an opening year, a project cost, a bridge, or a room count for the Omni hotel.Confirmed by City of Raleigh news post, Nov. 18, 2026
  • The Atlantic Union Bank Convention Center expansion page says the project is 298,100 square feet of new space, bringing the total facility to 798,100 square feet. It lists 50,000 square feet of divisible flex halls, an 18,000-square-foot ballroom, and 13 new meeting rooms with additional pre-function space. The city post says a flex hall, singular. The expansion page says flex halls, plural. The page says the Omni Raleigh Hotel is anticipated to include 600 guest rooms and 61,000 square feet of meeting space, plus food and beverage outlets, a rooftop pool, a Mokara spa, and a fitness center. It says the Red Hat Amphitheater will relocate one block south before the center expands. It does not give a year for the building, the hotel, or the amphitheater, and it does not state a project cost.Confirmed by Atlantic Union Bank Convention Center expansion page, read Nov. 19, 2026
  • WRAL, article:published_time and article:modified_time 2026-11-18T21:35:52Z, which is 4:35 p.m. Eastern. The visible posted clock reads 11/18/2026, 9:35:52 PM and matches that UTC figure. Byline: WRAL News. The story says an official groundbreaking was held Wednesday for a new building downtown. It says the development will add nearly 300,000 square feet and 13 new meeting rooms, and will connect the current Red Hat site to the existing convention center with two pedestrian bridges. It says construction on the convention center building is set to wrap up in 2029, with a grand opening scheduled for 2030. It says the new amphitheater is expected to open in June, in time for the new concert series, and it does not print a year on that June line.Confirmed by WRAL, published 4:35 p.m. Eastern Nov. 18, 2026
  • ABC11, by Elaina Athans. article:published_time 2026-11-18T23:29:00Z, 6:29 p.m. Eastern. article:modified_time 2026-11-18T23:32:54Z, 6:32 p.m. Eastern. The visible stamp reads Wednesday, November 18, 2026 11:32PM and matches the UTC modified clock. It is not read as Eastern. The story says ground was broken Wednesday at the site of the former Red Hat Amphitheater, that the venue hosted its final concert in October, and that a replacement amphitheater one block south is expected to open in June. It does not print a year on that June line. It says the expansion will add a new ballroom and a 50,000-square-foot flex hall. It says the Omni Hotel under construction near the center is expected to be completed at the end of 2028, and that the expanded convention center is slated to open in 2030.Confirmed by ABC11 / WTVD, Elaina Athans, modified 6:32 p.m. Eastern Nov. 18, 2026
  • CBS 17's public WordPress record for this slug has date_gmt 2026-11-17T19:15:02, which is 2:15 p.m. Eastern on Nov. 17, and modified_gmt 2026-11-18T12:18:04, which is 7:18 a.m. Eastern on Nov. 18. The HTML page returned 403. The record still says a groundbreaking is scheduled Wednesday and that Wednesday begins the work. Those lines were stored before the city's 5:03 p.m. post and are not used as proof the ceremony happened. The record says the expansion adds almost 300,000 square feet, 13 new meeting rooms, and an 18,000-square-foot ballroom, and that the footprint stretches to Red Hat Amphitheater's current location, connecting to the original building via two bridges. It says the new amphitheater is scheduled to open in time for the 2027 concert season, the Omni Hotel opens in 2028, and the new portion of the convention center is scheduled to open in 2029.Confirmed by CBS 17 WordPress record, modified 7:18 a.m. Eastern Nov. 18, 2026
  • The city's Oct. 21, 2026 post, already filed here, said the emptied Red Hat lot is where the convention center will expand and listed 298,100 square feet, divisible flex halls, an 18,000-square-foot ballroom, and 13 meeting rooms. It did not state a 50,000-square-foot hall or a project cost.Confirmed by City of Raleigh news post, Oct. 21, 2026

Still unknown

  • A start time for Wednesday's ceremony. The city post's 5:03 p.m. line is the page stamp, not a clock for the shovels
  • A project cost. The Nov. 18 city post and the expansion page do not print one. ABC11's phrase about millions of dollars in investment is not used as a figure
  • Which opening year the city has adopted. The Nov. 18 post says the work continues over the coming years and names no year. WRAL says a 2029 wrap-up and a 2030 grand opening. ABC11 says the expanded center is slated to open in 2030. CBS 17's advance story says the new portion opens in 2029
  • A year for the June amphitheater line. WRAL and ABC11 say June and do not print a year. CBS 17 says the 2027 concert season and does not print June. Those are not combined into June 2027
  • Whether the link is a pedestrian bridge in the city's own words. WRAL says two pedestrian bridges. CBS 17 says two bridges. The Nov. 18 city post and the expansion page do not describe the link. A glass-skybridge wording is not used
  • Lane closures or other traffic rules for this phase. The Nov. 18 city post does not list them

What this means for you

Instructions from City of Raleigh news post, Nov. 18, 2026

This site is not the City of Raleigh, Wake County, or the Atlantic Union Bank Convention Center. For the city's statement, use the Nov. 18 news post. The post says project updates are on the convention center's website. This site is not an emergency service. If someone is in danger, call 911.

What happened

In Raleigh, the city says it broke ground Wednesday, Nov. 18, 2026, on an expansion of the Atlantic Union Bank Convention Center.

The municipal post is headlined "Raleigh Celebrates Groundbreaking for Atlantic Union Bank Convention Center Expansion." A print line reads 11/18/2026 5:03 pm and does not name a zone. This file reads that stamp as Eastern. The post says the city has officially broken ground. It does not give a start time for the ceremony.

Mayor Janet Cowell, City Manager Marchell Adams-David, and Wake County Commission Chair Don Mial attended, the post says. So did Atlantic Union Bank Chief Marketing Officer Christine Landi and Baker Glasgow, president of Clancy & Theys, for the Construction Management Joint Venture.

What is being added

The city says the project adds 298,100 square feet of event space. That includes a 50,000-square-foot flex hall, an 18,000-square-foot ballroom, and 13 additional meeting rooms.

The center's own expansion page uses the same 298,100 figure and says the whole facility would then be 798,100 square feet. Where the city post says a flex hall, that page says 50,000 square feet of divisible flex halls. Both describe an 18,000-square-foot ballroom and 13 new meeting rooms. The expansion page also lists additional pre-function space.

WRAL, in a story whose machine time is 4:35 p.m. Eastern, says the new development adds nearly 300,000 square feet and 13 new meeting rooms. The visible posted clock on that page reads 9:35:52 p.m. and matches the UTC stamp. CBS 17's record, modified at 7:18 a.m. Eastern on Wednesday, says almost 300,000 square feet, 13 new meeting rooms, and an 18,000-square-foot ballroom. ABC11, by Elaina Athans, says the plan adds a new ballroom and a 50,000-square-foot flex hall. The visible ABC11 stamp reads 11:32 p.m. and matches the UTC modified time, 6:32 p.m. Eastern. None of those three stories prints 298,100 or 798,100.

Since opening in 2008, the city says, the building has welcomed more than 6 million visitors and generated more than $1 billion in economic impact. The three news stories read for this file do not print those figures.

"This expansion is happening at such an important time for so many of our stakeholders," Kerry Painter, executive director of The Complex, said in the city post. She also said it is retaining and bringing new customers to the center, to hospitality partners, and to downtown businesses.

WRAL calls her the convention center's executive director and quotes her on a process that began three or four years ago. CBS 17 uses the convention-center title as well. The quotations in the paragraph above are the city's.

The Red Hat site

ABC11 says Wednesday's groundbreaking was at the former Red Hat Amphitheater, which held its last concert in October. CBS 17 says the footprint reaches the amphitheater's current location. WRAL says two pedestrian bridges will tie that Red Hat site to the existing convention center. CBS 17 says the connection is two bridges and does not use the word pedestrian. The Nov. 18 city post does not describe a bridge. This file does not call the link a glass skybridge.

The city's Oct. 21 notice already said the emptied amphitheater lot is where the center will expand. That account is the final-show file. It listed 298,100 square feet, divisible flex halls, an 18,000-square-foot ballroom, and 13 meeting rooms. It did not mention a 50,000-square-foot hall.

Opening years, each from the page that printed it

The Nov. 18 city post says construction is expected to continue over the coming years. It does not name a finish year or an opening year. It also does not state a project cost. The expansion page does not state one either. No dollar figure is used here.

WRAL says work on the convention building is set to wrap up in 2029, with a grand opening scheduled for 2030. ABC11 says the expanded center is slated to open in 2030. CBS 17, in the advance story modified at 7:18 a.m., says the new portion is scheduled to open in 2029. That record still described the groundbreaking as scheduled. It is not the city's calendar, and it is not WRAL's or ABC11's.

On a replacement amphitheater, WRAL expects an opening in June, in time for the new concert series, and prints no year. ABC11 also says June, with no year, for a building one block south. CBS 17 says the new Red Hat Amphitheater is scheduled to open in time for the 2027 concert season. June and 2027 are not combined here. The Nov. 18 city post names a new amphitheater in the downtown plan and gives neither a month nor a year. The expansion page says the move is one block south, before the center expands, and gives no date.

CBS 17 says the Omni Hotel opens in 2028. ABC11 says that hotel is expected to be finished at the end of 2028. The expansion page says the Omni is anticipated to include 600 guest rooms and 61,000 square feet of meeting space, along with food and beverage outlets, a rooftop pool, a Mokara spa, and a fitness center. That page does not give a year. The city post names an Omni hotel and does not give a room count or a year.

Triangle Local is not the City of Raleigh or the convention center. For the city's statement, use the Nov. 18 post. If someone is in danger, call 911. Wake County stories are on the county page.

Related coverage

Photos

Text-only. No city, venue, or news photographs are used here.

Why it matters

Downtown Raleigh has started the convention-center expansion the city planned for the Red Hat lot. The square footage is in the city's post and on the center's page. The opening years are not. WRAL, ABC11, and an earlier CBS 17 story do not agree, and the Nov. 18 city post does not pick a year.

Updates

  1. Nov 19, 2026, 8:21 AM

    First file. The ceremony, the named attendees, 298,100 square feet, the 50,000-square-foot flex hall, the 18,000-square-foot ballroom, 13 additional meeting rooms, the 2008 opening, the visitor count, and the economic-impact line are the city's Nov. 18 post. The 798,100 total, the plural flex halls, 600 guest rooms, 61,000 square feet of hotel meeting space, and the one-block move are the center's expansion page. Two pedestrian bridges, a 2029 wrap-up, a 2030 grand opening, and June for the amphitheater are WRAL. The former-amphitheater site, June without a year, the end of 2028 for the Omni, and a 2030 opening are ABC11. Two bridges, the 2027 concert season, an Omni opening in 2028, and a 2029 opening for the new portion are CBS 17's advance story, modified at 7:18 a.m. Eastern, and are not treated as the city's schedule. No project cost is stated. lead is true so this Eastern publication day uses this file as the homepage lead. The Nov. 17 reassignment file's lead flag is set to false in the same change. onTikTok is false. Text-only.

Sources

  1. Raleigh Celebrates Groundbreaking for Atlantic Union Bank Convention Center Expansion (City of Raleigh, print stamp 11/18/2026 5:03 pm, no zone printed, read as Eastern. Officially broken ground. Today's groundbreaking. No ceremony clock. Mayor Janet Cowell, City Manager Marchell Adams-David, Wake County Commission Chair Don Mial, Atlantic Union Bank Chief Marketing Officer Christine Landi, and Baker Glasgow, president of Clancy & Theys, for the Construction Management Joint Venture. Kerry Painter, executive director of The Complex. Adds 298,100 square feet, including a 50,000-square-foot flex hall, an 18,000-square-foot ballroom, and 13 additional meeting rooms. More than 6 million visitors and more than $1 billion in economic impact since 2008. Part of a broader downtown vision that includes a new Red Hat Amphitheater and an Omni hotel. Construction expected to continue over the coming years. No finish year, no opening year, no cost, no bridge description, no hotel room count. Text-only. No city photo is used.)

    Official sourcePublished by City of Raleigh · Checked Nov 19, 2026, 8:21 AM

  2. Expansion page (Atlantic Union Bank Convention Center, read Nov. 19, 2026). 298,100 square feet of new space, total facility 798,100 square feet. 50,000 square feet of divisible flex halls. 18,000-square-foot ballroom. 13 new meeting rooms with additional pre-function space. Omni Raleigh Hotel anticipated to include 600 guest rooms and 61,000 square feet of meeting space, food and beverage outlets, a rooftop pool, a Mokara spa, and a fitness center. Red Hat Amphitheater relocates one block south before the expansion. No year and no project cost on this page. Text-only. No rendering is used.)

    Official sourcePublished by Atlantic Union Bank Convention Center · Checked Nov 19, 2026, 8:21 AM

  3. Raleigh breaks ground on nearly 300,000-square-foot convention center expansion (WRAL News. article:published_time and article:modified_time 2026-11-18T21:35:52Z, 4:35 p.m. Eastern. Visible posted clock 11/18/2026, 9:35:52 PM matches UTC). Wednesday groundbreaking for a new building. Nearly 300,000 square feet. 13 new meeting rooms. Two pedestrian bridges from the current Red Hat site to the existing convention center. Construction set to wrap up in 2029, grand opening scheduled for 2030. New amphitheater expected to open in June, in time for the new concert series, no year printed. Kerry Painter is called Raleigh Convention Center executive director in this story. The three-or-four-years quotation is this page's. No 298,100, no 798,100, no 50,000, no 18,000, no visitor count, no dollar cost. Text-only. No WRAL photo is used.

    Third-party sourcePublished by WRAL · Checked Nov 19, 2026, 8:21 AM

  4. Raleigh convention center expansion underway, aims to attract larger events (ABC11 / WTVD, Elaina Athans. article:published_time 2026-11-18T23:29:00Z, 6:29 p.m. Eastern. article:modified_time 2026-11-18T23:32:54Z, 6:32 p.m. Eastern. Visible stamp Wednesday, November 18, 2026 11:32PM matches the UTC modified clock and is not labeled Eastern). Ground broken Wednesday at the former Red Hat Amphitheater. Final concert in October. Replacement amphitheater one block south, expected to open in June, no year printed. New ballroom and a 50,000-square-foot flex hall. Omni expected to be completed at the end of 2028. Expanded center slated to open in 2030. A line about three full blocks is this page's. A line about millions of dollars is not used as a cost. Business quotations and sales percentages on this page are not used. Text-only. No ABC11 photo is used.

    Third-party sourcePublished by ABC11 · Checked Nov 19, 2026, 8:21 AM

  5. Raleigh convention center expansion to spur new business, life downtown (CBS 17 WordPress record. date_gmt 2026-11-17T19:15:02, 2:15 p.m. Eastern Nov. 17. modified_gmt 2026-11-18T12:18:04, 7:18 a.m. Eastern Nov. 18. HTML returned 403. No byline in the fields read here). Advance copy: groundbreaking scheduled Wednesday; Wednesday begins the work. Almost 300,000 square feet, 13 new meeting rooms, 18,000-square-foot ballroom. Footprint to Red Hat Amphitheater's current location, two bridges, deconstruction starts soon. New amphitheater scheduled for the 2027 concert season. Omni Hotel opens in 2028. New portion of the convention center scheduled to open in 2029. Painter is called executive director of the convention center. The scheduled-Wednesday lines are not used as proof the ceremony happened. No 50,000-square-foot hall, no 298,100, no pedestrian wording, no cost. Text-only.

    Third-party sourcePublished by CBS 17 · Checked Nov 19, 2026, 8:21 AM

  6. Big Changes Ahead for the New Red Hat Amphitheater (City of Raleigh, Oct. 21, 2026, already used in the Oct. 23 final-show file). Emptied amphitheater site is where the center will expand. 298,100 square feet, divisible flex halls, an 18,000-square-foot ballroom, and 13 meeting rooms. No 50,000-square-foot figure and no project cost in that post.

    Official sourcePublished by City of Raleigh · Checked Nov 19, 2026, 8:21 AM

More from Wake County

Wake County news

File photo

Government

Raleigh: Council hears teen curfew feedback, no vote

The Nov. 17 agenda asked members to receive a teen-engagement update as information. City slides show a curfew split of 49 percent wanting changes, 42 percent opposed and 10 percent supporting it as written. ABC11 reports that no vote was held.

File photo

Government

Durham: City lists 77 days of easily accessible water

Durham's Nov. 16 pages list 77 days of easily accessible water, 148 days in total, and reservoirs at 28 percent. Stage 2 stays in effect. A News & Observer story the next morning quotes Joe Lunne calling the 77-day figure a snapshot.

File photo

Government

Raleigh: NC regulators approve Duke Energy plan extending coal, adding gas

The Utilities Commission posted a Nov. 16 release on Duke Energy's carbon plan and resource plan. A Nov. 17 Duke release states annual residential increases of 4.8 percent and 4.7 percent. WRAL's two-year 9.5 percent and 9.3 percent figures stay with WRAL.